EN
Assembling:
Insert sealing ring. Observe the mounting
position: The wavy line must point at the
cover (see figure). Press it down all around
with your fingers.
Insert bottom cover into top cover. Screw on
bell nut and tighten firmly.
Checking cover closure
Check the locking mechanism; to do this,
the cover must be positioned so that the
Visiotherm S points upwards.
The rotary knob must be easy to turn.
When closed:
The safety latch must not be bent out-
wards.
Both bolts must be held completely.
If the cover closure does not function properly, the Secuquick softline may no longer
be used. Contact AMC customer service.
36
Check safety valve 3:
The sealing cap must be in place and clean.
Check by pressing it with a finger whether the blue
sphere (under the sealing cap) is not stuck, can move
freely and springs back.
Check that the valve in the cover is clean and free to
move.
Check the O-ring under the Visiotherm S:
The O-ring must not be damaged and must lie com-
pletely at the bottom of the groove.