Installing The Discharge Tubes - Toro 78463 Manuel De L'opérateur

Masquer les pouces Voir aussi pour 78463:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

14
Installing the Discharge
Tubes
Parts needed for this procedure:
1
Upper tube
1
Lower tube
3
Bolt (#10 x 3/4 inch)
3
Locknut (#10)
3
Washer (7/32 inch)
Procedure
1.
Lower the machine deck to the lowest
height-of-cut position.
2.
Remove the bags for viewing the tube under
the hood.
3.
Install the upper tube into the bagger opening
and pull it back out so that the hopper seal is
protruding out
(Figure
Figure 32
1. Upper tube
2. Bagger opening
4.
Align the dimple in the upper tube equally
between the screws securing the hopper seal to
the hopper
(Figure
32).
3. Bagger hood
33).
Note:
The hopper seal must protrude outward
from the bagger hood.
1. Dimple
5.
Install the lower tube into the upper tube
34).
g038294
1. Lower tube
6.
Slide the lower tube onto the blower housing
and latch them together
22
Figure 33
Figure 34
2. Upper tube
(Figure
35).
g007027
(Figure
g003424

Publicité

Table des Matières
loading

Table des Matières