Preparing The Machine; Installing The Rops Pivot Shoulder Bolts - Toro 78463 Manuel De L'opérateur

Masquer les pouces Voir aussi pour 78463:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

1

Preparing the Machine

No Parts Required
Procedure
1.
Park the machine on a level surface.
2.
Move the motion-control levers to the N
3.
Engage the parking brake.
4.
Shut off the engine and remove the key.
2
Installing the ROPS Pivot
Shoulder Bolts
Parts needed for this procedure:
2
Shoulder bolt
2
Wave washer
2
Locknut (1/2 inch)
Procedure
1.
Secure the shoulder bolt to the roll bar using a
wave washer and locknut (1/2 inch) as shown
in
Figure
5.
2.
Repeat this procedure on the other side.
-L
position.
EUTRAL
OCK
Figure 4
1. Locknut (1/2 inch)
2. Wave washer
9
Figure 5
3. Shoulder bolt
g037289
g341473

Publicité

Table des Matières
loading

Table des Matières