Installation; Typical Installation: Vented (Open) Installation - clage M Serie Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 35
EN

Installation

3. Installation
Installation, initial operation and maintenance of this appliance must only be conducted
by an authorised professional, who will then be responsible for adherence to applicable
standards and installation regulations. We assume no liability for any damages caused
by failure to observe these instructions!

3.1 Typical installation: vented (open) installation

Electrical connection with
mains power cable
(shorten if necessary)
Fig. 3: "Vented installation with a special open-outlet tap" (dimensions in mm)
Insert the special tap aerator:
M 3/4: CSP 3
M 6/7: CSP 6
Angle valve outlet G ⅜"
24

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

M 3M 4M 6M 7

Table des Matières