Section 5 − Installation; Site Selection - Miller D-74S Manuel Du Propriétaire

Masquer les pouces Voir aussi pour D-74S:
Table des Matières

Publicité

5-1. Site Selection

1
5
.
A complete Parts List is available at www.MillerWelds.com
SECTION 5 − INSTALLATION
3
6
!
!
4
1
2
Choose slot that allows all rubber
feet to sit securely on top of welding
power source.
3
4
2
.
5
6
.
Wire feeder shown is representative
only and does not reflect actual unit.
Do not put feeder where
welding wire hits cylinder.
Do not move or operate
equipment when it could
tip.
Wire Feeder
Rubber Feet
Wire Spool/Reels
Gas Cylinder w/Hose And
Regulator (Customer
Supplied)
Shielding gas pressure not to
exceed 100 PSI (689 kPa).
Welding Power Source
Running Gear
Ref. 803 048
OM-1500-6 Page 15

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

D-74d

Table des Matières