Reviewing The Valve Zone Conversion; Conversion Documentation - Aventics AV03 Description Technique Et Mode D'emploi

Avec io-link
Masquer les pouces Voir aussi pour AV03:
Table des Matières

Publicité

66
AVENTICS | AV03/05 with IO-Link | R412018145–BAL–001–AC
Conversion of the Valve System
A
AES-
AES-
IOLINK-
IOLINK-
24DO
24DO
AV03-B
AV03-B
IO-Link
P
D
AES-
IOLINK-
24DO
AV03-B
IO-Link
P
Fig. 11: Examples for impermissible configurations
Part number
P
B
C
10.4.4

Reviewing the valve zone conversion

Following the conversion of the valve zone, use the following checklist to determine whether you
have complied with all rules.
 Have you mounted no more than 24 solenoid coils?
 Have you always installed the multipole boards to be in line with the base plate limits, i.e.
– Two base plates 3x are installed with the IO-Link interface multipole board,
– One base plate 2x is installed with one multipole board, 2x,
– Two base plates 2x are installed with one multipole board, 4x,
– One base plate 3x is installed with one multipole board, 3x?
 Have you adhered to the minimal configuration?
If you have answered "Yes" to all these questions, you may proceed with the documentation and
configuration of the valve system.
10.4.5

Conversion documentation

After a conversion, the part number (MNR) on the right end plate and the address table are no longer
valid.
Mark the part number and address table so that it is clearly visible that the unit no longer
corresponds to its original condition on delivery.
P
B
E
AES-
IOLINK-
24DO
AV03-B
IO-Link
P
C

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Av05

Table des Matières