Commissioning The Valve System With Io-Link - Aventics AV03 Description Technique Et Mode D'emploi

Avec io-link
Masquer les pouces Voir aussi pour AV03:
Table des Matières

Publicité

54
AVENTICS | AV03/05 with IO-Link | R412018145–BAL–001–AC

Commissioning the Valve System with IO-Link

7
Commissioning the Valve System
with IO-Link
Before commissioning the system, the following steps must have been carried out and completed:
You have assembled the valve system with IO-Link interface.
You have connected the IO-Link interface to the IO-Link master (see AV valve system assembly
instructions).
Commissioning and operation may only be carried out by qualified electrical or pneumatics
personnel or an instructed person under the direction and supervision of qualified personnel
(see "Personnel qualifications" on page 47).
Danger of explosion with no impact protection!
Mechanical damage, e.g. strain on the pneumatic or electrical connectors, will lead to non-
compliance with the IP65 protection class.
In explosive environments, make sure that the equipment is installed in a manner that
protects it from all types of mechanical damage.
Danger of explosion due to damaged housings!
Damaged housings can lead to an explosion in explosive areas.
Make sure that the valve system components are only operated with completely assembled
and intact housing.
Danger of explosion due to missing seals and plugs!
Liquids and foreign objects could penetrate and destroy the device.
Make sure that the seals are integrated in the plug and not damaged.
Make sure that all plugs are mounted before starting the system.
Risk of uncontrolled movements when switching on the system!
There is a danger of personal injury if the system is in an undefined state.
Put the system in a safe state before switching it on.
Make sure that no personnel are within the hazardous zone when the compressed air supply
is switched on.
1. Switch on the operating voltage.
On start-up, the IO-Link master sends parameters and configuration data to the IO-Link interface
and the electronics in the valve zone.
Before applying the working pressure, the diagnostic LED may only be illuminated in green, as
described in Table 8:
DANGER
CAUTION

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Av05

Table des Matières