Supports À Clouer; Top View - Fireplace Xtrordinair 564 GSR2 25K Manuel D'installation

Masquer les pouces Voir aussi pour 564 GSR2 25K:
Table des Matières

Publicité

Supports à clouer
There are four nailing brackets
on the front of the fireplace.
Follow the directions below to
prepare the nailing brackets.
Once in place, nail or screw the
nailing brackets to the framing.
NOTE: Additional nailing
brackets are provided along
the base of the fireplace.
Use these brackets if not
using the front brackets.
1/2''(13mm)
Drywall
For installations using 1/2''
(13mm) facing fold the larger
tab out 90°. Use a
screwdriver if necessary.
5/8''(16mm) Drywall
For installations using
5/8'' (16mm) drywall fold
the shorter tab out 90°
Use a screwdriver if necessary.
© Travis Industries
Installation
(for qualified installers only)
3/18/2019 – 1491-FR
Make sure the fireplace is
square and plumb when
placed in the framing.
Measured corner-to-
corner, the fireplace
should be square (approx.
54-7/8'' (1394mm) for each
dimension). Use shims to
insure the fireplace is
square.
TOP VIEW
Fireplace
TOP VIEW
Fireplace
17
Framing
Nailing Bracket
Drywall
Framing
Nailing Bracket
Drywall
564 GSR2 25K

Publicité

Table des Matières
loading

Table des Matières