Supports À Clouer; Top View - Fireplace Xtrordinair 564 HO NB GSR2 Manuel Du Propriétaire

Table des Matières

Publicité

Installation
14
Supports à clouer
There are four nailing brackets
on the front of the fireplace.
Follow the directions below to
prepare the nailing brackets.
Once in place, nail or screw the
nailing brackets to the framing.
NOTE: Additional nailing
brackets are provided along
the base of the fireplace.
Use these brackets if not
using the front brackets.
1/2" (13mm) Drywall
For installations using 1/2"
(13mm) drywall fold the
larger tab out 90° (use a
screwdriver if necessary).
5/8" (16mm) Drywall
For installations using 5/8"
(16mm) drywall fold the
shorter tab out 90° (use a
screwdriver if necessary).
Travis Industries
(pour les installateurs qualifiés uniquement)
4170315
WARNING:
Make sure the fireplace is
square and plumb when
placed in the framing.
Measured corner-to-
corner, the fireplace
should be square (approx.
47-1/8" (1197mm) for each
dimension). Use shims to
insure the fireplace is
square.
TOP VIEW
Fireplace
TOP VIEW
Fireplace
Framing
Nailing Bracket
Drywall
Framing
Nailing Bracket
Drywall
100-01408-FR

Publicité

Table des Matières
loading

Table des Matières