Fig. 2: Rear side
2 = Scaffold mount
3 = Transformer cover
4 = Tension strap
Subsequently loosen the upper set screw (no. 5, fig. 1) and the lower set screw (no. 6, fig. 1) for the cutting bow (no. 1,
fig. 1); open this fully and then retighten the set screws (no. 5 and no. 6, fig. 1).
Loosen the set screw (no. 7, fig. 1) of the bearing rail (no. 8, fig. 1), fold it out fully to the right and then retighten the
set screw (no. 7, fig. 1). The bearing rail (no. 8, fig. 1) is now located at a 90° angle to the cutting wire. To ensure the
foam board is held securely unfold the board supports (no. 11a/b, fig. 3) as well.
Now insert the mains plug into the socket (230 V).
The device is operational when the On/Off switch (no. 9, fig. 3) on the transformer is switched on and illuminated.
2
4
3
46