Télécharger Imprimer la page

Friedrich Hazardgard Manuel D'installation Et D'utilisation page 21

Climatiseur individuel pour les lieux dangereux

Publicité

Les langues disponibles

Les langues disponibles

Chassis Wiring and Preparation (Non ATEX)
PROVIDED HARDWARE
1 JUNCTION BOX
2 MOUNTING LEGS
2 LEG SCREWS
2 HOLE COVERS
1 STAINLESS STEEL
GROUND SCREW
2 SCREWS
1 SHEET METAL SCREW
STEP1 Remove the junction box, cover and screws from the shipping position underneath the fan motor (See Figure 7). Install one
junction box mounting leg in the upper left position facing the rear of the junction box. (Figure 27)
Figure 27
STEP2 Remove and discard the threaded bushing wire protector from the conduit connector on the side panel of the control
compartment. Install field supplied cable gland as required. Strip the wires approximately 1/2 inch (13 mm).
Figure 28
21

Publicité

loading

Ce manuel est également adapté pour:

Sh15Sh20Sh24Hazardgard sh15Hazardgard sh20Hazardgard sh24