Dantherm HCV 4 Manuel D'installation page 13

Masquer les pouces Voir aussi pour HCV 4:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Adjustment,
continued
Procedure, continued
Step
5
6
7
Install the manometer on pressure pipe P1
and P2 and measure the supply air pres-
sure loss through the heat exchanger.
Adjust the main air flow on the supply air
side by adjusting the potentiometer for
the supply air fan until the required pres-
sure difference has been achieved. The
potentiometer can be found on the con-
trol panel.
After adjusting the potentiometers, wait
approx. 2 minutes until the unit is stable
again.
Strong wind against the building may
affect the adjustment of the unit.
Connect the pressure manometer to the
pressure pipes P3 and P4 and measure the
pressure loss through the heat exchanger.
Action
P2
P1
P3
P4
Continued overleaf
11

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hcv 5

Table des Matières