Installation Checklist - Vaillant 0020232108 Notice D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 27

2 Installation checklist

12
System control
12k
Limit thermostat
1.2
Wiring diagram 0020232108
2
Heat pump
3e
Circulation pump
5c
Combi cylinder (tank in tank)
2
Installation checklist
You must observe all the operating and installation instructions included with the system components.
Work
1
Comply with the conditions for the installation environment
2
Install the heat pump on a wall that has sufficient load-bearing capa-
city
3
Comply with the specified minimum clearances
4
Observe the position of the VRC 700
5
Check the brine circuit for leak-tightness
6
Insulate the brine pipes in the house so that they are vapour-diffu-
sion-tight
7
Use cold pipe clips to install the brine pipes in the house
8
Use the correct brine fluid
2
12m
Outdoor temperature sensor
12
System control
12k
Limit thermostat
12m
Outdoor temperature sensor
Comments/settings
1.
Minimum volume of the installation room 1.60 m³
Environmental temperature 7 °C – 40 °C
2.
3.
Frost-proof
4.
Dry
For free spaces for maintenance work, see the installa-
tion instructions for the relevant system components
1.
The room temperature sensor is deactivated in the
heat pump's electronics box
2.
In the living room or main control room
Prevent condensation.
Prevent thermal bridges.
Monoethylene glycol, essential for fault-free operation.
System installation instructions 0020251824_01

Publicité

Table des Matières
loading

Table des Matières