Commissioning Checklist - Vaillant 0020232108 Notice D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 27
Work
9
Use the correct mixing ratio of monoethylene glycol to water
10
Use a refractometer to check the mixing ratio
11
Choke the output of the filling pump
12
Sufficiently dimension the uniTOWER's expansion vessel for the
heating circuit
13
Connect the heat pump via a separately fused plug socket
14
Connect the back-up heater from the uniTOWER via a 400 V connec-
tion
15
Use connection terminals when connecting multiple conductors
16
Check all cable connections for tensile strength
17
Visually check all cable connections for damage
3

Commissioning checklist

3.1
VIH QW 190/1 E
Work
1
Start the installation assistant
Language
2
3
Check program: Purging of building circuit active
4
Contact details
5
End the installation assistant?
Menu → Installer level → Test menu → Sensor/actuator test
6
7
Check T.1.63 SP1 temperature
3.2
VWS 36/4.1 230V
Work
8
Start the installation assistant
9
Language
10
Freeze protection
11
Purge environment and building circuit
12
Purge building circuit
13
Check program: Purge environment circuit
14
Contact details
15
End the installation assistant?
Menu → Installer level → Test menu → Sensor/actuator test
16
17
T.82 Building circuit pressure
18
T.101 Environment circuit pressure
19
T.146 Outside temperature
0020251824_01 System installation instructions
Commissioning checklist 3
Comments/settings
3:7, efficient operation only when the defined mixing ratio
is used
Efficient operation only when the defined mixing ratio is
used
Reduce the penetration of air in the brine circuit.
No expansion vessel present in the heat pump.
Observe the connection conditions in accordance with
the data plate.
Observe the connection conditions in accordance with
the data plate.
Prevent communication faults.
Comments/settings
If it is not started automatically
Select
Starts automatically, end after approx. 30 minutes
Enter on the VRC 700
Yes
Actual cylinder temperature
Comments/settings
OK
Select
−10 °C
No
No
Yes, test active, end after approx. 30 minutes
Enter on the VRC 700
Yes
Check, at least 1500-2000 mbar
Check, at least 1500-2000 mbar
Check, actual temperature display
3

Publicité

Table des Matières
loading

Table des Matières