general information
EN
1.2
installation overview
11
5
3
6
12
9
4
7
8
Recommended installation steps:
1. Determine venting requirements before deciding the final location of the appliance
2. Plan out appliance enclosure, framing, fronts, accessories, etc.
3. Install rough framing (refer to "rough framing" section)
4. Place the appliance in its final position
5. Install nailing tabs (refer to "nailing tab installation" section)
6. Install appliance venting (refer to "venting installation" section)
7. Install vent shield (refer to "vent shield installation" section)
8. Install all electrical wirings (refer to "electrical information" section)
9. Install gas lines (refer to "gas installation" section)
10. Test appliance
11. Complete framing (refer to "finish framing" section)
12. Finishing (refer to "finishing" section)
13. Complete installation checklist in the owner's manual and apply the serial number to the owner's
manual.
7
W415-1707 / 07.04.17