Toto EcoPower TET2GA Manuel D'installation Et D'utilisation page 14

Valve de chasse
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION PROCEDURE — SMALL COVER
The Flush Valves are preset for flush volume as
marked on the valve carton. The valves do not
require adjustment for variation for water pressure
within its operating range.
19. Open the control stop completely.
20. Activate the Flush Valve several times.
21. In the case of excessive flow rate, adjust the flush
volume, gradually adjust the control stop clock-
wise, towards the closed position, until there is
suitable water flow into the filter.
WARNING: Do not open the control stop to the point where the flow from the Flush Valve
exceeds the flow capability of the fixture. In case of a valve failure, the water
must not overflow from the fixture.
After connecting the battery, the initialization process takes 5 minutes. After approximately 30
seconds, the sensor LED will start flashing in 4 second intervals until the initialization is
complete. Please wait before starting the Test Run.
1. For Toilet: Sit on the toilet seat.
For Urinal: Stand within two feet from the front of the Flush Valve.
2. Stay there for 6 seconds or more and then leave the toilet seat or the urinal. The valve
should automatically flush, immediately for urinals and after 3 seconds for toilets.
3. Press the manual flushing button. The toilet or urinal should flush and the red
light of the sensor should flash. To correct overflow from a urinal Flush Valve, adjust the
control stop clockwise.
4. Recheck all the pipe connections for water leaks. If the Flush Valve is not operating
properly following the test run consult the Troubleshooting section on p.16.
TEST RUN
14
Control stop
Open

Publicité

Chapitres

Table des Matières
loading

Table des Matières