2 Hang panel on, connect water, open wall connection
angle and test for soundness (The fitting must installed,
flushed and tested after the valid norms!).
Fitting the Protective Profile, Connecting the Water/Transformer
Corner installation
Corner installation: Press seal in.
Corner installation
3 Push the 12 V cable through the wiring conduit and
connect transformer. For maintenance work should be 1m
cable behind the panel.
27