Start Process Is Not Being Initiated - Panduit CP-991 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

© Panduit Corp. 2018

8.2 Start process is not being initiated

PA29440A01_00 ENG
OPERATION MANUAL
Check the air pressure
Disconnect the compressed air connection (1)
Check the air pressure at the manometer (2):
CP-991: 5 bar
CP-992: 5.5 bar
No pressure present:
Check whether the compressed air connection is
connected to the compressed air supply
Check whether the compressed air supply is O.K.
Pressure is not 5 bar/5.5 bar:
Pull the air pressure regulator (3) upwards
Set the air pressure by turning (4) to the right (+)
or left (-)
Then press the regulator (5) downwards
If the conductor is inserted, the CP-991 will not start.
Check the front door
Check that the front door (1) is completely closed and
locked
1
Check the air pressure
Check air pressure at the manometer (1):
CP-991: 5 bar
CP-992: 5.5 bar
No pressure present:
Check whether the compressed air connection is
connected to the compressed air supply
Check whether the compressed air supply is O.K.
Pressure is not 5 bar/5.5 bar:
Disconnect the compressed air connection
Pull the air pressure regulator (2) upwards
Set the air pressure by turning (3) to the right (+) or
left (-)
Then press the regulator (4) downwards
Page: 24 of 26
CP-991 / CP-992
ENGLISH
11-2018

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Cp-992

Table des Matières