Operation
5 Operation
5 .1 Switching on
f The power-supply outlet must be readily accessible so
that the system can be de-energised if the need arises.
f Keep the main switch OFF when the AT2000 CPK is not
in use and when a change is to be made.
f Switch the power pack CPK ON at the main switch.
; The
Signal
and
Power
show green.
; The
Status
LED on the AT2000 CPK shows green.
; The welcome screen appears on the display:
7
Autotool 2000 CPK
; The device is ready for use.
5 .2 Switching off
f Switch the main switch on the power pack CPK OFF.
5 .3 Loading cable ties
8
3
f Insert cable ties
parallel with the drum. Make sure that
1
cable-tie heads
are facing up.
2
f Press trigger
.
3
; If there are no cable ties in the device three blank shots
are fired.
12
LEDs on the power pack CPK
1
5 .4 Positioning and binding items for bundling
f Set the
Force level
à „Settings menu" on page 14 or à „Changing
binding parameter settings" on page 18.
f Check the time and date; set if necessary,
à „Date / time" on page 15.
The device is suitable for the following bundle geometries:
9
3
2
The distance from end cap
42 mm and bundle
diameter.
CAUTION
Crush hazard when jaws close .
f Do not insert fingers between top and bottom jaws and
2
do not keep your finger on the trigger.
f Always keep the power pack CPK switched OFF when
clearing a blockage.
10
3
f Centre bundle
adjacent cable ties at least 10 mm apart.
f Press trigger
2
; Bundle
is secured by the cable tie.
1
and/or
Quality
parameters,
20 mm
42 mm
1
to flat
must be at least
1
2
can be no more than 20 mm in
3
1
in line with end-cap screws
1
.
AT2000 CPK• Operating Instructions • 04-2015 • 106-29004
2
. Space
3