POURING THE CONCRETE SLAB

> >
Position the top layer of rebar (second layer) over the entire surface of the excavation
before pouring the concrete.
Once laid, the metal trellis should cover the whole surface (lay the trellis such that it is
set 3 to 5 cm back from the edge around the entire periphery). Some cutting around
the posts will be necessary (fi g 9a.). Bars should be allowed to overlap and should be
connected together.
Figure 9
Figure 9a
While pouring the slab, make sure that the
upper rebar mesh is encased to the correct
depth in the concrete.
(minimum 3 cm)
Level the surface and smooth it as carefully
as possible in order to minimise protrusions
and asperities that will have to be corrected
later.
Figure 9b
CAUTION
Encase the base
s
e the bas
he
he
b
se
e
of the metal posts
of the metal p sts
metal po s
et
ta
l
ost
with a small amount
i
h
small am un
mall amo
all
l
ou
nt
of concrete before
concret
on
crete be re
e
fo
pouring the rest of
uring th
ng the r
g the res of
t o
f
the slab, this will help
ab, this will hel
, this will help
th
l
h
prevent deformation of
t deformation
deforma
eformation o
tio
ti
the metallic structure.
lic struc
tructure
u
(fi g. 9a).
See fi gures 7 and 9b to
9b t
b
determine the correct
height of the concrete
slab with respect to the
posts.
The fi nish of the
concrete slab will
determine the correct
seating of the walls as
well as the quality of the
pool fl oor.