◗
After correctly positioning the fi rst layer of rebar (fi g 3), set out the metallic posts required
to assemble your pool (fi g 8). Make sure that you fi t them with jacks fi rst (fi g. 4). These posts
are joined together at the bottom with fl at bars fastened by two screws (bag of screws A and
B fi g. 4).
◗
The distance between the each post is determined by the length of the fl at bars.
◗
The fl at bars features 4 holes at each end.
◗
The upper and lower connection bars are identical.
◗
Around the base, the outer holes are used (fi g. 4) while the inner holes are used on
bars around the top of the structure. (fi g 6).
Figure 6
Figure 7
Level of the
fi nished slab
AR
Slab
thickness
GROUND - BOTTOM OF THE EXCAVATION
◗
Once the metallic structure has
been assembled, adjust the
position of the posts carefully
and check :
and perfectly aligned.
Height before
AV
measured at the axis of the
resurfacing
corner jacks are equal. (fi g 8)
CAUTION
Take particular care
during this stage of
the assembly, it will
impact subsequent
phases and
determine the quality
of the pool fi nish.
49