USER MANUAL
MACHINE WORKING HOUR CHECK
1.
Turn the ignition key (A, Figure22) to "I".
2.
Press the switch (B), the hour meter (C) begins to work
and it at the same time shows the total number of working
hours (scrubbing/drying) performed by the machine.
3.
Release the switch (B).
4.
Turn the ignition key (A) to "0".
FUSE CHECK/REPLACEMENT
1.
Turn the ignition key (A, Figure22) to "0".
2.
Disconnect the power supply cable(C, Figure23) from the
electrical mains.
3.
Remove the screws(C .Figure24) on control panel (D),
then turn over the PCB to find the fuse (A, B, Figure 24).
4.
Check/replace the following fuses:
A) F1 fuse, low power circuit fuse:(5A)
B) F3 fuse, Brush release fuse: (20A)
5.
Perform steps 1 to 3 in the reverse order.
6.
Check/press down or replace the following breakers:
E)
F5breaker, vacuum motor circuit breaker: (30A)
F)
F4 breaker, drive system circuit breaker: (12A) (*)
G) F2breaker, brush motor circuit breaker: (30A)
(*): Only for machine with traction
B
A
C
Figure 23
B
A
B
C
D
V A C U U M T R A C T I O N B R U S H
E
24
ENGLISH
A
C
B
Figure 22
W
G
/ A
R
T H
E
G E
L
O
E T
U
E
S -
W
D I
F
G
Figure 24