Installation Of The Baffle; Wiring Work - Gree GMV-ND100L/A-T Manuel D'utilisateur

Unité intérieure au sol pour drv multiple
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Multi VRF Floor Standing Indoor Unit
Models
GMV-ND100L/A-T
GMV-ND140L/A-T

4.6 Installation of the Baffle

Please install it after installation of connection pipe and drainage pipe according to Fig.4.6
① Loosen the screws and adjust the baffle position up and down to clamp connection pipe/drainage pipe as
much as possible.
② Tighten the screws.

5 Wiring Work

Notes:
Units must be earthed securely, or it may cause electric shock.
Please carefully read the wiring diagram before carry out the wiring work, incorrect wiring could cause
malfunction or even damage the unit.
The unit should be powered by independent circuit and specific socket.
The wiring should be in accordance with related regulations in order to ensure the units reliable running.
Install circuit breaker for branch circuit according to related regulations and electrical standards.
Keep cable away from refrigerant pipings, compressor and fan motor.
The communication wires should be separated from power cord and connection wire between indoor
unit and outdoor unit.
Adjust the static pressure via wired controller according to site circumstance.
Copyright 2018. This translation is property of GREE PRODUCTS SL. All rights reserved. Total or partial reproduction without its express authorization is prohibited.
Fig 4.5
Gas Pipe(mm/inch)
Φ16
5/8
Φ16
5/8
Fig.4.6
8
Liquid pipe(mm/inch)
Φ9
3/8
Φ9
3/8

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Gmv-nd140l/a-t

Table des Matières