Bypass Plumbing Instructions: If Flow Rate; Exceeds 348 L/Min (92 Gpm); Figure 16. Connecting Cell Leads; Figure 17. Pod Connector - Zodiac AquaPure Ei Série Guide D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Zodiac
AquaPure
®
Red

Figure 16. Connecting Cell leads

16. Attach the terminal cap.
17. Plug the pod connector into the power pack (see
Figure 17).
Pod Connector

Figure 17. Pod Connector

18. Attach one end of the bonding wire to the
bonding lug located on the bottom of the chassis
backplate on the power pack (see Figures 18
and 19). Attach the second end to a common
bonding point such as the pool pump or heater.
Make sure to refer to the pump or heater manual
for the location of the bonding lug connection
prior to making this connection. See Figure 20
for examples of bonding lug locations. Do not
use the power pack as the common bonding
point. There should only be one bonding
connection to the power pack. Each piece of
non-related pool equipment requiring a ground
should also be bonded to the common, approved
bonding point.
19. Plug the power pack into the electrical outlet.
Turn the power pack on.
Ei Series APURE35PLGC
®
Black
Red
Blue
|
Installation and Operation Manual

Figure 18. Bonding Wire

Bonding Wire

Figure 19. Bonding Wire Attached to Power Pack

Pump

Figure 20. Bonding lug locations

3.4
Bypass Plumbing instructions: if
Flow Rate Exceeds 348 L/min (92
GPM)
If flow rate exceeds 348 L/min (92 gpm), the cell must be
plumbed on bypass otherwise it may result in property
damage, personal injury, or death.
English
Bonding
Lug
heater
Bonding Wire
WARning
Page 15

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Apure35plgc

Table des Matières