English
Page 14
Figure 10. Cell Clamps Attached
O-Ring
Figure 11. Water Flow Arrows
12. Install the cell and the pod making sure the
pod is installed upstream from the cell. When
installing the pod, make sure the flow switch
is inserted into the inlet port on the clamp (see
Figure 12).
Figure 12. installing Pod and Cell
13. Position the locking ring in proper alignment,
making sure the bump aligns with the top thread
(see Figure 13).
Zodiac
AquaPure
Ei Series APURE35PLGC
®
®
Figure 13. locking Ring Alignment
14. Screw down the locking ring to the threaded
nOTE Ensure the locking ring is level when engaging the
Water Flow
Figure 14. locking Ring Tool
Figure 15. locking Ring level
15. Securely connect the cell leads to the like
|
Installation and Operation Manual
Align bump with
top thread on
the lower clamp
clamp using the locking ring tool (see Figure
14).
threading housing (see Figure 15).
Locking Ring tool
coloured terminals (see Figure 16).
x