Report prepared for Guillaume Thibodeau-Fortin (Stove Builder International Inc.) on
6/26/2019 7:45:42 AM
TEST REPORT 103536746MTL-002
TEST REPORT FOR STOVE BUILDER INTERNATIONAL INC.
Report No.: 103536746MTL-002
Date: 07/13/18
The air control was opened for 16.5 minutes or when 15% of the load weight has been
consumed, and then set at the lowest burn rate. The fan was turned on at low speed at 30
minutes. Due to a bad manipulation in the post leak check of the sampling system, black soot got
sucked by one of the filter train. After weighting, the deviation ratio was above 7.5 % which leads
to an invalid test run.
RUN #2 (May 23
a category "Low burn rate" of 1.3 kg/hr. Let the door ajar for 6.5 minutes, and then closed. The air
control was opened for 16.5 minutes or when 15% of the load weight has been consumed, and
then set at the targeted burn rate. The fan was turned on at low speed at 30 minutes.
RUN #3 (May 24
a category "Medium burn rate" of 1.7 kg/hr. Let the door ajar for 6.5 minutes, and then closed.
The air control was opened for 16.5 minutes or when 15% of the load weight has been
consumed, and then set at the targeted burn rate. The fan was turned on at medium speed at 30
minutes.
RUN #4 (May 25
High burn rate of 3.9 kg/hr. The door was open for 5 minutes, then closed. The air control was
fully opened. Start the fan at full speed.
TABLE 1 – EMISSIONS
RUN#
2
3
4
*Data including the cold-Start
TABLE 2 – TEST FACILITY CONDITIONS
RUN
#
2
3
4
TABLE 3 – DILUTION TUNNEL FLOW RATE MEASUREMENTS AND SAMPLING DATA
Version: 05/10/17
Stove Builder International Inc. | 44826 | Rev: May 31 2019 2:49PM | Uncontrolled Copy
rd
2018) Air control set at the targeted burn rate, burn time was 600 minutes with
th
2018) Air control set at the targeted burn rate, burn time was 470 minutes with
th
2018) Air control set fully opened, burn time was 200 minutes with a category
TEST
BURN RATES
PARTICULATE
DATE
(kg/hr)(Dry)
EMISSION
RATE (g/hr)
May 23,
1.3
2018
May 24,
1.7
2018
May 25,
2.18*
*1
3.9
2018
ROOM
ROOM
BARO
TEMP
TEMP
PRES
BEFORE
AFTER
BEFORE
(°F)
(°F)
(in/Hg)
85
84
30
87
86
30
73
89
30
(17 OF 21)
st
1
HOUR
CO EMISSIONS
EMISSIONS
(g)
6.34
0.74
1.48
5.29
4.59
BARO
R. H.
R. H.
PRES
BEFORE
AFTER
AFTER
(%)
(%)
(in/Hg)
30
28
21
30
17
13
30
32
23
Page 17 of 21
8431 Murphy Drive
Middleton, WI 53562
Telephone: 608-836-4400
Facsimile: 608-831-9279
www.intertek.com/building
HEATING
(g/min)
EFFICIENCY
(%HHV)
1.3
72%
1.7
71%
1.4
68%
AIR VEL
AIR VEL
BEFORE
AFTER
(ft/min)
(ft/min)
0
0
0
0
0
0
GFT-OP-10c