Report prepared for Guillaume Thibodeau-Fortin (Stove Builder International Inc.) on
6/26/2019 7:45:42 AM
TEST REPORT 103536746MTL-002
TEST REPORT FOR STOVE BUILDER INTERNATIONAL INC.
Report No.: 103536746MTL-002
Date: 07/13/18
Pressure transmitter
Vacuum transmitter
Vacuum transmitter
Pressure gauge
Vacuum gauge
Relative humidity
temperature meter
200 g weight
SECTION 6
LIST OF OFFICIAL OBSERVERS
NAME
Guillaume Thibodeau-Fortin
Claude Paré
Claude Pelland, P.E.
SECTION 7
TEST PROCEDURE
From May 22
was conducted in accordance with ASTM E3053-17 and ASTM E2515-11. The fuel used for
the test run was Beech Cordwood.
The applicable EPA regulatory limits are:
Step 1 – 2015 – 4.5 grams per hour.
Step 2 – 2020 – 2.0 grams per hour.
TEST SET-UP DESCRIPTON
A 6" flue is connected to a standard 6" diameter vertical single wall pipe and insulated chimney
system was installed to 15' above floor level. The single wall pipe extended to 8 feet above the
floor and insulated chimney extended the remaining height.
Version: 05/10/17
Stove Builder International Inc. | 44826 | Rev: May 31 2019 2:49PM | Uncontrolled Copy
SBI-294
June 16, 2018
SBI-301
June 16, 2018
SBI-302
June 16, 2018
SBI-307
June 20, 2018
SBI-308
June 20, 2018
SBI-310
November 03, 2018
SBI-312
October 01, 2018
COMPANY
Stove Builder International Inc.
Stove Builder International Inc.
Intertek B&C
nd
to May 25th, the unit was tested for EPA emissions. For Wood stoves, the test
Page 5 of 21
(5 OF 21)
8431 Murphy Drive
Middleton, WI 53562
Telephone: 608-836-4400
Facsimile: 608-831-9279
www.intertek.com/building
±9.5e-003 psi
±6.5e-003 in.HG
±6.5e-003 in.HG
±5.8e-002 psi
±5.8e-002 in.HG
±3%
±0.034 mg
GFT-OP-10c
Page 331 of 425