STONEFIRE FREESTYLE FRAMING KIT
Note: This kit must be installed or serviced by a qualifi ed installer, service agency or gas supplier.
These instructions are to be used in conjunction with the main installation instructions for the above
listed model.
WARNING: If the information in these instructions is not followed exactly, a fi re or explosion
may result causing property damage, personal injury or loss of life.
The kit consists of a set of black sheet metal panels used to frame the 530 engine to accommodate the Front and the
Alhambra or Mesh Screen Doors. Combustible wall fi nish may contact the sides and top of the framing kit. The framing kit
may be installed fl ush or protruding from the wall fi nish but not recessed into the wall.
Top Bracket
Insulation Pad
w/extension
baffl e
Heat
Duct
Window
Trim
LH Side
Bracket
Frame
Mounting
Brackets
(4)
Valve
Shield
Freestyle Framing Kit components
REFER TO MAIN INSTALLATION BOOKLET SUPPLIED WITH THE ENGINE.
REFER TO INSTALLATION BOOKLET SUPPLIED WITH EACH KIT.
4001071-06
SFFK01
INSTALLATION INSTRUCTIONS
CSA approved for use only with
Valor Model 530 Heater
Standoffs
Fret
(required,
Back Support
sold separately)
Bracket
RH Side
Bracket
Bottom Panel
Overview
FOR ENGINE CONFIGURATIONS AND VENTING,
FOR FRONT, FRET AND DOORS INSTALLATIONS,
Freestyle Framing Kit
(includes ZC components
shown here)
Front
(required,
sold separately)
Doors
(optional, sold separately)
(See price list for choice of Fronts, Frets and Door Kits.)
TM
530 Engine
(required, sold
separately)

Publicité

Table des Matières
loading

Sommaire des Matières pour Miles Industries STONEFIRE SFFK01

  • Page 1 SFFK01 STONEFIRE FREESTYLE FRAMING KIT INSTALLATION INSTRUCTIONS CSA approved for use only with Valor Model 530 Heater Note: This kit must be installed or serviced by a qualifi ed installer, service agency or gas supplier. These instructions are to be used in conjunction with the main installation instructions for the above listed model. WARNING: If the information in these instructions is not followed exactly, a fi re or explosion may result causing property damage, personal injury or loss of life.
  • Page 2 Note: These instructions are in addition to installation instructions supplied with Valor 530 firebox unit. Any combustible framing construction must be clear of standoffs. • A non-combustible hearth is not necessary in front of this appliance. • The 530 fireplace is approved to install directly on wood sub-flooring. • Any combustible framing construction must be clear of standoffs. 26” 23” 20” Center of vent Fixing tabs to secure framing 1-1/2”...
  • Page 3: Mantel Clearance

    CLEARANCES Side View Mantel Clearance Framing Diagram Mantel Depth ‘A’ 2” 4” 6” 8” 12” Mantel Height ‘B’ 34” 36” 38” 40” 42” Combustible Combustible wall finish wall finish Kit installed flush with or protruding from wall finish. NOTE: This framing kit MUST protrude from the wall finish by a min.
  • Page 4: Assembly Diagram

    FRAMING KIT ASSEMBLY The heat duct bottom lip fits under the edge of the firebox top. Assembly Diagram...
  • Page 5 1. Unpack the kit and ensure you have all the components as shown on page 1. 2. Fix the back support bracket to the 530 engine with 2 #8 Phillips screws supplied. 3. Place the bottom panel under the front of the 530 engine. It is not necessary to attach it to the firebox. However, if it is desired, the panel can be fixed to the engine by drilling two holes in the panel and fixing it with 2 #10 Phillips screws supplied. The fireplace should now be leveled at 1-1/2” above the ground. If the fireplace 1-1/2” needs to be higher to accommodate floor finish, ensure that the whole surface RH Side View underneath the fireplace AND the bottom panel is raised evenly. 4. Fix the heat duct, the side brackets and the top bracket to the firebox with #10 Phillips screws provided. See the assembly diagram on the previous page. Note: When using the SFFT01 4-Sided Trim (supplied separately), the protruding extension baffle must be removed from the top bracket assembly. Remove the baffle by inserting a Phillips screwdriver through the space between the top bracket and the baffle and remove the 2 screws. Install the top bracket (with the extension baffle removed) as indicated on page 4. Remove extension baffle 5. Required for installation in combustible construction. Fix the standoffs to the back of the fireplace with 8 #10 Phillips screws supplied.
  • Page 6 7. On the outside of each side bracket, loosely fix the frame mounting brackets— 2 per side—with the 8 #10 thread forming screws supplied. 8. Slide the mounting brackets at the appropriate distance from the front of the side brackets to receive the wall finish (1/2” to 2-1/2” from the front)*. Tighten the screws to fix the mounting brackets. * NOTE: To install the SFFT01 4-sided Trim, the framing kit must protrude by 1/2 inch from the wall finish. NOTE: When using protruding kit application with top vent, make sure the header behind the wall finish (if used) does NOT interfere with the vent pipe. Use the header on its narrow side to avoid interference. No interference Interference with using the narrow vent pipe when using side of the wide side of header header Fixing tabs to secure to framing 9. Fix the framing kit to the studs...
  • Page 7 4001073 Insulation Pad 620B987 Valve Shield 4001557AZ Hardware Kit 4001289 Designed and Manufactured for/by MILES INDUSTRIES LTD. 190 - 2255 Dollarton Hwy., North Vancouver, BC, CANADA V7H 3B1 Tel 604-984-3496 Fax 604-984-0246 www.valorfireplaces.com © 2009, Miles Industries Ltd. All rights reserved.
  • Page 8 SFFK01 ENCADREMENT STONEFIRE FREESTYLE MANUEL D’INSTALLATION Approuvé par la CSA pour usage exclusif avec le foyer Valor modèle 530 Note: Ce kit doit être installé ou maintenu par un installateur qualifi é, une agence de service certifi ée ou un fournisseur de gaz. Ces instructions doivent être utilisées conjointement avec les instructions d’installation du modèle de foyer mentionné ci-haut. MISE EN GARDE: Si les instructions fournies dans le présent manuel ne sont pas suivies à la lettre, un feu ou une explosion pourraient résulter et causer des dommages matériels, des blessures ou la mort.
  • Page 9 Note: Ces instructions sont en plus des instructions fournies avec le foyer Valor 530. Tout encastrement doit être construit à distance des écarteurs. • Une base de foyer non-combustible n’est pas nécessaire devant cet appareil. • Le foyer 530 est certifié pour installation directement sur un sous-plancher de bois. • Tout encastrement doit être construit à distance des écarteurs. 66 cm (26”) 26” 58 cm (23”) 23” 51 cm (20”) 20” Centre Center de l’évent of vent Fixing Supports de tabs to...
  • Page 10: Schéma D'encastrement

    DÉGAGEMENTS Manteau ou tablette combustible 88 cm (34-1/2”) du sol à la poutre du dessus et finition du 36 cm (14”) Côté droit 67 cm (26-1/2”) Dégagement pour tablette ou (permettre plus d’espace pour les coudes dans les évacuations arrières) manteau de cheminée Profondeur de 5 cm 10 cm 15 cm 20 cm 30 cm Schéma d’encastrement manteau ‘A’...
  • Page 11: Assemblage De L'encadrement

    ASSEMBLAGE DE L’ENCADREMENT Détail de l’assemblage de la canalisation Le rebord du bas de la canalisation se place sous le rebord de la boite de foyer Schéma d’assemblage...
  • Page 12 1. Déballez la trousse d’encadrement et assurez-vous d’avoir en main toutes les pièces montrées au schéma de la page 8. 2. Fixez le support arrière au moteur 530 avec 2 vis Phillips no. 8 fournies. 3. Placez le panneau du bas sous l’avant de la boite de foyer. Il n’est pas nécessaire de le fixer. Cependant, si vous désirez le fixer, percez des trous sur le panneau et fixez-le à l’aide de 2 vis Phillips no. 10 fournies. Le foyer devrait être ainsi élevé 4 cm (1-1/2”) à 4 cm (1-1/2”) du plancher. Si le foyer doit être élévé plus haut pour Côté droit faciliter l’installation de la finition du plancher, assurez-vous que toute la surface sous le foyer et sous le panneau avant soit au même niveau. 4. Fixez la canalisation, les supports des côtés et le panneau du haut à la boite de foyer à l’aide de vis Phillips no. 10 fournies. Consultez le schéma d’assemblage de la page précédente. Note : Lorsque vous utilisez la Bordure à 4 côtés SFFT01 (vendue séparément), le déflecteur doit être détaché et enlevé du panneau du haut. Enlevez les 2 vis retenant le déflecteur en insérant un tournevis Phillips entre la paroi du dessus et le déflecteur tel qu’indiqué ci-dessous. Installez le panneau du haut (sans le déflecteur) tel qu’indiqué à la page 11. Enlevez le déflecteur 5.
  • Page 13 7. Sur le côté extérieur de chaque support de côté, fixez les deux supports de montage à l’aide de 8 vis auto-formeuse no. 10 fournies. 8. Glissez les supports de montage à la position désirée pour accomoder l’épaisseur de la finition du mur (de 1 à 6 cm [1/2” à 2-1/2”]* du devant de l’encadrement). Serrez les vis pour fixer les supports de montage. * NOTE : Pour installer la Bordure à 4 côtés SFFT01, l’encadrement doit dépasser de 1/2 pouce de la finition du mur. NOTE: Lors d’une installation avec encadrement en saillie et évacuation sur le dessus, assurez-vous que la poutre située au-dessus du foyer derrière le mur (si utilisée) soit posée sur son côté plutôt qu’à plat, afin d’éviter son empiètement sur le passage du conduit d’évacuation. Empiètement sur le conduit Aucun empiètement sur le d’évacuation par la poutre à conduit d’évacuation par la plat poutre sur le côté...
  • Page 14 Écarteur droit 4001073 Coussin isolant 620B987 Écran de soupape 4001557AZ Quincaillerie 4001289 Conçu et fabriqué pour/par MILES INDUSTRIES LTD. 190 - 2255 Dollarton Hwy., North Vancouver, C.-B., CANADA V7H 3B1 Tél. 604-984-3496 Téléc. 604-984-0246 www.foyervalor.com © 2009, Miles Industries Ltd. Tous droits réservés.

Ce manuel est également adapté pour:

Valor stone fire sffk01530

Table des Matières