Installing The Grafik Eye Qs System - Lutron QSG-3PCE Guide D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installing the GRAFIK Eye
1.Mount a 89 mm (3 1/2-in.) deep
4-gang wallbox on a dry, flat indoor
surface that is accessible and allows
for system programming and
operation. Allow at least 110 mm
(4 1/2 in.) clearance above and below
the faceplate to ensure proper heat
dissipation. Allow 25 mm (1 in.) for
faceplate overhang on all sides.
Note: 4-gang wallbox available from
Lutron; P/N 241400.
2.Mount the control unit in the wallbox
as shown using the four screws
provided.
Note: Follow all local and national
electrical codes when installing Class
2 PELV wiring with line voltage/mains
wiring.
3.Apply the protective overlay to the
control unit. See page 14 for
instructions for naming zones.
Test the Wiring
1.Restore power.
2.Press the top button on the lighting
keypad. The LED will light.
3.Press the zone raise or lower button.
Make sure the control unit is dimming all
connected loads.
R
QS System
®
Faceplate overhangs
wallbox on all sides;
allow 25 mm (1 in.)
LUTRON
110 mm
(4.5 in.)
LUTRON
200 mm
(7.9 in.)
87 mm
(3.5 in.)
95 mm
(3.75 in.)
Note: When tightening mounting
screws, make sure that the hinged
cover and faceplate will open fully,
as shown.
Protective overlay
(apply after installation)
GRAFIK Eye
QS System Installation and Operation Guide 7
®