Proline PGC5050W-F Manuel D'utilisation Et D'installation page 47

Masquer les pouces Voir aussi pour PGC5050W-F:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

3. INSTALLATION
For the oven burner, let it run at minimum position for 5 minutes. Open and close the oven
door 2-3 times to check the stability of the burner flame.
During the conversion from LPG to NG, the bypass screw must be unscrewed. When converting
from NG to LPG, the same screw must be tightened up. During this adjustment, make sure the
cooker is unplugged and the gas supply is open.
Non-thermostatic oven valve
Bypass screws
Figure 13
Changing the Gas Inlet:
Regularly check the expiry date of your cooker gas pipe. When the expiry date is reached, it is
necessary to change the hose.
These pipes are available on the market and must be consistent with current standards.
After changing the hose, you should check that there is no leakage by referring to the
information in the above paragraph: Connecting gas and checking leakage.
14

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Pgc5060sl-fPgc5060w-f

Table des Matières