Pre-Installation Requirements - KROHNE OPTIFLEX 1300 C Mode D'emploi

Transmetteur de niveau radar à ondes guidées
Masquer les pouces Voir aussi pour OPTIFLEX 1300 C:
Table des Matières

Publicité

2
MONTAGE

2.6 Pre-installation requirements

INFORMATION !
The following precautions must be taken to make sure it is correctly installed.
• Make sure that there is adequate space on all sides.
• Protect the signal converter from direct sunlight and install the weather protection accessory
if necessary.
• Do not subject the signal converter to heavy vibrations. The devices are tested for vibration
and agree with EN 50178 and IEC 60068-2-6.
To make sure that you install the device quickly, easily and safely, prepare the installation as
given in the instructions that follow.
10
www.krohne.com
OPTIFLEX 1300 C
11/2009 - 4000154302 - QS OPTIFLEX1300 R06 fr

Publicité

Table des Matières
loading

Table des Matières