Unpacking, Checking And Installation; Levelling - KERN ADB 100-4 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7.2 Unpacking, checking and installation

Open packaging and remove all parts carefully.
Verify that there has been no damage and that all packing items are present.
Scope of delivery / serial accessories
• Balance
• Mains adapter
• Operating instructions
Prior to any installation and assembly works, the balance must
be separated from the mains supply.
 Install the balance at the intended workplace.
The right place is decisive for the accuracy of the weighing results of high-
resolution analytic balances (see chap. 7.1).
 Remove the transportation lock (only models ADJ)
 Put the following parts upon in the right order
Carrier of weighing plate
Weighing pan

7.3 Levelling

 Level balance with foot screws until the air bubble of the water balance is in the
prescribed circle.
Check levelling regularly.
12
ADB_ADJ-BA-e-1931

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Adb 200-4Adb 600-c3Adj 100-4Adj 200-4Adj 600-c3

Table des Matières