Chapter 7. Ordinary Maintenance; Instructions For Ordinary Maintenance Work; Lubrication; Plastic Film And Other Scrap Removal - Minipack-Torre Tunnel 50 Twin Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 38

Chapter 7. Ordinary maintenance

7.1. Instructions for ordinary maintenance work

ORDINARY MAINTENANCE MUST BE CARRIED OUT BY QUALIFIED, APPROPRIATELY TRAINED STAFF.
Before carrying out maintenance, switch the machine off with the main ON/OFF switch, disconnect
it and wait for the machine to cool down!

7.2. Lubrication

Periodically lubricate the conveyor belt chains using
lubricant for high temperature such as:
grease with silicone
non melting grease.

7.3. Plastic film and other scrap removal

It is very important to periodically clean the tunnel inside
so to remove all scraps.
Wait for the tunnel to cool down properly before cleaning it!

7.4. Machine cleaning

Use a cloth moistened with water for tunnel cleaning.
Do not use solvents but common detergents

7.5. Replacement of the supply cord

ATTENTION!
If the supply cord is damaged, it must be replaced by the manufacturer, its service agent or similarly
qualified persons in order to avoid a hazard.
23
EN

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Tunnel 70

Table des Matières