Connecting Control Voltage Cables; Configuration Of The Installation; Configuring The Bow And / Or Stern Thruster - Vetus BOW PRO Série Instructions D'installation

Masquer les pouces Voir aussi pour BOW PRO Série:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 45
5 .6

Connecting control voltage cables

• Mount the control panel at the helm position. There must be 150
mm of free space behind the panel.
• Connect the panel as shown in the dia-
gram.
See diagrams on page 143 if several pan-
els have to be connected.
• Connect the motor's control voltage cable
to the connection box.
• Connect the hub to a 12-Volt power sup-
ply.
n
ote
The hub should also be connected to
12 Volts in the case of a 24-Volt bow
thruster .
n
ote
The CAN bus is a chain to which the bow
thruster and the panels are connected.
At one end of the chain, the power sup-
ply must be connected and the terminator
must be connected at the other end!
6

Configuration of the installation

Both the panels and the bow thruster / stern must be configured correctly.
6 .1

Configuring the bow and / or stern thruster

Bow thruster
If only one (1) bow thruster is installed configuration is not necessary.
Stern thruster
If only one (1) stern thruster is installed configuration is not neces-
sary, but consider the stern thruster panels as bow thruster panels
when configuring.
Bow thruster + Stern thruster
The default configuration is for use as a bow thruster.
Only the configuration of the stern thruster must be adapted.
Configure a stern thruster by cutting the red cable as shown in the
drawing.
30
020803.01
Control panel
Terminator
Connection cable
Hub
24 V
+
12 V
Control voltage fuse
vetus® Installation instructions BOW PRO Series Thrusters: BOWA0361 and BOWA0421
- BPPJA
- BPPPA
Connection box thruster
Connection cable
CAN-bus supply
Red

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bowa0361Bowa0421

Table des Matières