Télécharger Imprimer la page

Mitsubishi Electric CITY MULTI PEFY-P125VMHS-E-F Manuel D'installation page 5

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 23
[Fig. 9.2.1]
B
A
M1M2
M1M2
TB3
TB5
[Fig. 9.2.3]
D
M1
N
L
[Fig. 9.3.1]
P125
B
A
[Fig. 9.3.3]
P125
M1
M2
B
C
P200·250
E
A
C
B
A
S
1
2
M1M2
S
1
2
TB15 TB5
TB15
C
C
B
2
A
1
S
M2
DC10~13V
C
A
B
1
2
P200·250
B
Screws
A
Control box cover
B
A
S
Terminal block
A
D
Round terminal
B
Shield wire
C
The earth wire from two cables are connected together to the S terminal. (Dead-end connection)
D
E
Insulation tape (To keep the earth wire of the shielded cable from coming in contact with the trans-
E
mission terminal)
F
G
A
Use PG bushing to keep the weight of the cable and external force from being applied to the power supply
terminal connector. Use a cable tie to secure the cable.
Wind the wire around the cable strap once to keep it from being pulled out.
B
Power source wiring
Use ordinary bushing
D
Terminal bed for indoor transmission
F
H
Transmission line to the M-NET Remote controller
D
I
H
9.2
[Fig. 9.2.2]
B
M1M2
TB3
[Fig. 9.2.4]
D
N
L
9.3
[Fig. 9.3.2]
P125
B
A
A
To prevent external tensile force from applying to the
wiring connection section of power source terminal
block use buffer bushing like PG connection or the like.
Power source wiring
B
Tensile force
C
Use ordinary bushing
D
Transmission wiring
E
C
E
G
I
A
A
M1M2
S
M1M2
S
TB5
TB5
C
C
A
Terminal block for indoor transmission cable
Terminal block for outdoor transmission cable
B
Remote controller
C
B
2
1
S
M2
Non-polarized
A
M1
A
TB15
B
Remote Controller
C
DC24~30V
TB5
D
C
1 2
(A, B)
A
D
C
E
E
Tensile force
Power source terminal bed
Terminal bed for remote controller
Transmission line to the MA Remote controller
D
5

Publicité

loading

Ce manuel est également adapté pour:

City multi pefy-200vmhs-e-fCity multi pefy-250vmhs-e-f