7
[Fig. 7.1.1]
[Fig. 7.1.2]
[Fig. 7.2.1]
A
B
8
[Fig. 8.0.1]
H
F
Outer wall
I
Downward
inclination
A
E
9
[Fig. 9.1.1]
A
B
~220-240V
4
Cut here
A
Remove brazed cap
B
A
Cool by a wet cloth
A
1
F
C
D G
D
C
C
C
C
C
7.1
[Fig. 7.1.3]
A
B
A
D
7.2
C
C
E
D
E
Air inlet
A
C
Access door
E
Duct (Arrange on site)
G
Keep duct-work length 850 mm or more
H
Insulator (Arrange on site) I
B
9.1
Ground-fault interrupter
A
Local switch/Wiring breaker
B
Indoor unit
C
Pull box
D
C
Thermal insulation
A
Pull out insulation
B
E
C
Wrap with damp cloth
D
Return to original position
E
Ensure that there is no gap here
F
Wrap with insulating tape
F
A
Downward slope 1/100 or more
C
Drain hose (Accessory)
B
Indoor unit
C
Collective piping
D
Maximize this length to approx. 10 cm
E
2
Air outlet
B
D
Ceiling
F
Canvas duct (Arrange on site)
Hood (Arrange on site)