Télécharger Imprimer la page

Forch BEG 204 Mode D'emploi page 16

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 17
5379 2_Bedien.Bremsentlüftungsgerät_Bedien.9890 504 Mini A5.qxd 18.12.2013 09:08 Seite 17
Trouble shooting
Problem
Pump does not suck
or does not build up
pressure.
No power to unit
Pump does not
relieve pressure after
filling
Guarantee
This unit is guaranteed against defects in material and workmanship for a period of 12 months from the
purchase date (as confirmed by bill or delivery slip). Any damage will be eliminated by repair or replacement.
Damage resulting from natural wear and tear, overload or improper handing is excluded from this guarantee.
Complaints will be recognized only when the unit is returned without disassembling to us or your Förch field
service representative.
CE Declaration of Conformity
We confirm at our own sole responsibility that this product complies with the following standards and
standardizing documents.
89/392/EC last modified by 93/68/EC as well as EN 292.
Testing principles:
EN 292-1, EN 292-2 and particularly:
- Voltage spikes and interruptions in compliance with EN 55104:1995
- Resistance to voltage surges in compliance with ENV 50142, EN 55104:1995
- Resistance to static electric discharge in compliance with ICE 801-2 Edition 1991-04, EN 55104:1995
- Resistance to rapid transient interference (burst) in compliance with ICE 801 -4 Third impression 1991,
EN 55104:1995
- Conducted interference in lines induced by RF fields in compliance with ICE 801-6, EN 55104:1995
- Electromagnetic fields in compliance with ICE 801-3 Draft 5 Second edition 1991, ENV50140T3/2.95,
EN 55104:1995
- Radio frequency interference from electrical operating equipment and systems in compliance with
EN 55104 (interference voltage/RF interference power) CE 99
Cause
Fluid reservoir empty
Pressure reservoir turned
all the way up or down,
intake hose kinked
Air in hose
Fuse defective
Pressure regulator setting
reduced during bleeding
operation
Remedy
Change reservoir
Set operating pressure
correctly (approx. 2 bars)
unkink, replace hose, if
defective.
Bleed unit in same manner
as for initial use
Replace fuse 6
Turn pressure regulator
to right to relief point.

Publicité

loading

Ce manuel est également adapté pour:

5379 2