Installation of the body
Installation of the body
If the replace is to be installed with a prefabricated casing,
If the replace is to be installed with a prefabricated casing,
Edilkamin can specify the exact position of the replace only
Edilkamin can specify the exact position of the replace only
if it knows what type of casing will be used. The position will
if it knows what type of casing will be used. The position will
differ according to the chosen model (consult the assembly
differ according to the chosen model (consult the assembly
instructions contained in every casing package). During instal-
instructions contained in every casing package). During instal-
lation always check vertical and horizontal positions.
lation always check vertical and horizontal positions.
- make a hole in the wall or oor for the external air vent and
- make a hole in the wall or oor for the external air vent and
connect it to the air regulation mechanism as described in the
connect it to the air regulation mechanism as described in the
chapter "external air vent"
chapter "external air vent"
- connect the replace to the ue with a stainless steel pipe of
- connect the replace to the ue with a stainless steel pipe of
the diameter indicated in the technical data table (page 22) and
the diameter indicated in the technical data table (page 22) and
the indications of the " ue" chapter
the indications of the " ue" chapter
- kits are available for channelling hot air as described in detail
- kits are available for channelling hot air as described in detail
on page 26.
on page 26.
- on completion of installation, allow the movement of the door by
- on completion of installation, allow the movement of the door by
unscrewing the red counterweight lock screw on the side.
unscrewing the red counterweight lock screw on the side.
- check that all moving parts work correctly.
- check that all moving parts work correctly.
Coating, mantel and aeration ( g. 1)
Coating, mantel and aeration ( g. 1)
Before installing the lining, the correct functioning of the con-
Before installing the lining, the correct functioning of the con-
nections, the controls and all moving parts must be checked.
nections, the controls and all moving parts must be checked.
The check must be carried out with the replace lit and burning
The check must be carried out with the replace lit and burning
at normal rate for several hours and before tting the lining in
at normal rate for several hours and before tting the lining in
order to be able to take any action necessary.
order to be able to take any action necessary.
The nishing operations can then be carried out, such as:
The nishing operations can then be carried out, such as:
- construction of the mantel
- construction of the mantel
- the tting of the lining
- the tting of the lining
- installation of pilasters, painting, etc. which must be carried
- installation of pilasters, painting, etc. which must be carried
out after successful testing.
out after successful testing.
Edilkamin will not be liable for any demolition or reconstruc-
Edilkamin will not be liable for any demolition or reconstruc-
tion costs even if consequent to the replacement of any defec-
tion costs even if consequent to the replacement of any defec-
tive parts of the replace.
tive parts of the replace.
The parts of the casing in marble, stone and bricks must be t-
The parts of the casing in marble, stone and bricks must be t-
ted a small space from the prefabricated product to avoid them
ted a small space from the prefabricated product to avoid them
breaking due to expansion and excessive overheating.
breaking due to expansion and excessive overheating.
In particular, in tting the skirting board below the edge of the
In particular, in tting the skirting board below the edge of the
hearth:
hearth:
- a suitable gap must be left for the recirculation of the environ-
- a suitable gap must be left for the recirculation of the environ-
mental air
mental air
- it must be possible to inspect and/or replace the fans, in the
- it must be possible to inspect and/or replace the fans, in the
case of a replace with forced ventilation.
case of a replace with forced ventilation.
The parts in wood must be protected by reproof panels, not
The parts in wood must be protected by reproof panels, not
tted closely but at a suitable distance of at least 1 cm to allow
tted closely but at a suitable distance of at least 1 cm to allow
for the air ow which prevents the accumulation of heat. The
for the air ow which prevents the accumulation of heat. The
mantel must be made of reproof plasterboard panels or plaster
mantel must be made of reproof plasterboard panels or plaster
slabs; during construction the hot air channelling kit must be
slabs; during construction the hot air channelling kit must be
tted as indicated above. The area inside the mantel should
tted as indicated above. The area inside the mantel should
be aired by the ow of air which enters from below (space
be aired by the ow of air which enters from below (space
between the door and the beam), which will exit by convec-
between the door and the beam), which will exit by convec-
tion from the upper grill, allowing for the recovery of heat and
tion from the upper grill, allowing for the recovery of heat and
avoiding excessive overheating.
avoiding excessive overheating.
In addition to the above, it is also necessary to take into
In addition to the above, it is also necessary to take into
consideration paragraphs 4.4 and 4.7 of the standard UNI
consideration paragraphs 4.4 and 4.7 of the standard UNI
10683 "insulation, nish, casing and safety recommenda-
10683 "insulation, nish, casing and safety recommenda-
tions"
tions"
INSTALLATION
Ornamental beams
Ornamental beams
Ornamental wooden beams may be tted in front of the re-
Ornamental wooden beams may be tted in front of the re-
place casing, but only if they are outside the eld of irradiation
place casing, but only if they are outside the eld of irradiation
and at least 1 cm from the casing itself.
and at least 1 cm from the casing itself.
The cavity which insulates the ornamental elements and the
The cavity which insulates the ornamental elements and the
casing must not allow heat to accumulate.
casing must not allow heat to accumulate.
Ornamental wooden beams must not be integral parts of the
Ornamental wooden beams must not be integral parts of the
building
building
Fig. 1
- 28
-
Hot air
ow
grille
hot air outlet from
the mantel
Mantel
Door slider
guide
Metal mantel
Hood
Wooden
beam
Front part
Air inlet in the
mantel
sliding door