INSTALLAZIONE
The hot air produced by the replace is released into the rooms
The hot air produced by the replace is released into the rooms
to be heated by the nozzles connected to the holes on the cover
to be heated by the nozzles connected to the holes on the cover
of the hood with aluminium pipes Ø 14 cm.
of the hood with aluminium pipes Ø 14 cm.
It is essential to guarantee the return of the air into the room
It is essential to guarantee the return of the air into the room
where the replace is installed by means of grills at the base of
where the replace is installed by means of grills at the base of
the walls or gaps under the doors.
the walls or gaps under the doors.
The diameter of the pipes must not be less than Ø 14 cm.
The diameter of the pipes must not be less than Ø 14 cm.
The line of the pipes must be as straight as possible.
The line of the pipes must be as straight as possible.
The aluminium pipes can be hidden with coffer work or false
The aluminium pipes can be hidden with coffer work or false
beams or they can be built into the walls; in any case, they
beams or they can be built into the walls; in any case, they
must be well insulated.
must be well insulated.
The channels must have a maximum length of 6÷8 m each for
The channels must have a maximum length of 6÷8 m each for
version V
version V
Installation of hot air circulation kit
Installation of hot air circulation kit
The following kits are available to duct the hot air:
The following kits are available to duct the hot air:
Kit six/bis, only the replace room
Kit six/bis, only the replace room
- fasten tting "R2" to the hole in the hood
- fasten tting "R2" to the hole in the hood
- insert pipe (21) and x with the bands provided
- insert pipe (21) and x with the bands provided
- wall-in the frame with the tting of vent "B2" on the upper
- wall-in the frame with the tting of vent "B2" on the upper
part of the mantel
part of the mantel
- connect the aluminium pipe to the tting, locking it with the
- connect the aluminium pipe to the tting, locking it with the
band; press in the front grill
band; press in the front grill
- t the two "G1" slots into the mantel, above the replace, to
- t the two "G1" slots into the mantel, above the replace, to
Kit six bis
allow for aeration inside the mantel.
allow for aeration inside the mantel.
Kit six/bis, only adjacent room
Kit six/bis, only adjacent room
- fasten tting "R2" to the hole in the hood
- fasten tting "R2" to the hole in the hood
- insert pipe (21) and x with the bands provided
- insert pipe (21) and x with the bands provided
- set the frame with the tting of vent "B2" into the wall of the
- set the frame with the tting of vent "B2" into the wall of the
room to be heated
room to be heated
- connect the aluminium pipe to the tting, locking it with the
- connect the aluminium pipe to the tting, locking it with the
band; press in the front grill
band; press in the front grill
- t one "G1" slot in the upper part of the mantel to allow the
- t one "G1" slot in the upper part of the mantel to allow the
exit of hot air from the mantel and another "G1" slot in the
exit of hot air from the mantel and another "G1" slot in the
lower part to allow ventilation of the mantel itself.
lower part to allow ventilation of the mantel itself.
The hot air outlets vents, at the top of the hood, that are not
The hot air outlets vents, at the top of the hood, that are not
used must be left free.
used must be left free.
Special channelling can be created by adding extra components
Special channelling can be created by adding extra components
to the kits available, as shown in the price list.
to the kits available, as shown in the price list.
Kit six bis
- 26
-