14. CHECKS
Adjust the belt and cable control tension after the first few working hours to compensate
-
initial loosening.
Briefly operate all the machine's components to detect any abnormal noises or
-
overheating.
During the initial running in period avoid heavy-duty usage to encourage proper settling
-
of the mechanical parts.
Never neglect maintenance operations after work and carry out all prescribed checks
-
regularly.
A) TYRE PRESSURE
Regularly check the tyre pressure. (1.8 bar - 23 psi ).
If both two tyres are not inflated to average pressure the machine will tend to travel sideways
during operation.
ANY COMPLEX JOB AND ANY WORK AFFECTING THE SAFETY OF
THE OPEATOR AND/OR OTHER PERSONS MAY ONLY BE CARRIED
OUT AT AN AUTHORISED SERVICE CENTRE
WARNING!
- 56 -