MAINTENANCE

WARNING:
All maintenance procedures must be performed by qualified personnel, or by an authorized
Service Center.
WARNING:
Maintenance procedures must be performed:
– With the machine switched off
– With the battery disconnected (if required)
– With the battery charger cable disconnected from the electrical mains
Moreover, read carefully the instructions in the Operator's Safety Instructions chapter before
performing any maintenance procedure.
The lifespan of the machine and its maximum operating safety are ensured by correct and regular maintenance.
The following table provides the scheduled maintenance. The intervals shown may vary according to particular working
conditions, which are to be defined by the person in charge of the maintenance.
This Manual describes only the easiest and most common maintenance procedures.

SCHEDULED MAINTENANCE TABLE

Procedure

Battery charger cable integrity check

Side and main broom height check and adjustment
Skirt height and operation check
Dust filter cleaning and integrity check
Hopper gasket check
Filter shaker operation check
Drive belt and clutch visual inspection
Drive system belt tensioner adjustment
Nut and screw tightening check
Motor carbon brush check or replacement
(*): For the relevant procedure, see the Service Manual.
(1): And after the first 8 hours.
BATTERY CHARGER CABLE INTEGRITY CHECK
Carefully check the battery charger cable (A, Fig. 5) and the
relevant plug (B) for cuts, wear and other damages.
If necessary, have them replaced by Clarke Service Center.
Operator's Manual - BSW 28
Every 10
Every 50
hours
hours
ENGLISH
Every 200
Every 400
hours
hours
(*)
(*)
(*)
(*) (1)
(*)