Maintenance Plan - ATT Nussbaum POWER LIFT HF 3S 5000 Manuel D'exploitation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Maintenance
Time frame
type position
E F G
12
1
11
2
10
1 x / 12
9
3
4
8
5
7
6
12
1
11
2
10
1 x / 12
9
3
4
8
5
7
6
12
1
11
2
10
1 x / 12
9
3
4
8
5
7
6
88
The booms and bolts of the lifting arm and the threaded bolts of the
carrier plate are to be checked for ease of running. If required, lightly
grease with a multi-purpose grease.
Do not over-lubricate.
• Check the torque of the fastening anchor. See the data sheet for the
relevant anchor manufacturer.
• Check the torque of the fastening screws. Also see the assembly pro-
tocol.
Torque (Nm) for shaft screws
Fastening class 8.8
0,08*
M8
17,9
H
M10
36
M12
61
M16
147
M20
297
M24
512
Fastening class 10.9
0,08*
M8
26,2
M10
53
M12
90
M16
216
M20
423
M24
730
*
Lubricated slide friction number 0.8 MoS2
**
Lightly oiled slide friction number 0.12
***
Ensured slide friction number 0.14 screw with micro-encapsulated plastic
All weld seams must have a visual inspection. Stop the system and
contact the manufacturer if there are cracks or breaks in weld seams..
Maintenance plan
0,12**
0,14***
23,1
25,3
46
51
80
87
194
214
391
430
675
743
0,12**
0,14***
34
37,2
68
75
117
128
285
314
557
615
960
1060
OPI-POWER LIFT HF 3S 5000-V3.0-DE-EN-FR-ES-IT

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Nussbaum power lift hf 3s 5000 dgNussbaum power lift hf 3s 5000 universalNussbaum hymax hf 3s 5000Nussbaum hymax xx 3200 hfNussbaum hymax hf 3s 5000 universal

Table des Matières