Preparation Of The Unit; Cabin Walls Preparation; Installation Of The Unit - SNDC ECOCLIM SKIMO SPLIT 12V Notice De Montage, De Service Et De Maintenance

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Open the cardboard of the SKIMO SPLIT unit.
Remove the foam protection surrounding the 2 units.
Take the SKIMO SPLIT unit, remove the 4 screws of the cover to reach in the 4
unit fastening screws.
Prépa ra tion pour fix
SPLIT (dimension : m m)
a
Preparation
for
fastening the
(dimension : mm)
Drill in the chosen wall 4 holes in diameter 10 mm
Percer dans la paroi choisie 4 trous en diamètre
10 mm selon le schéma d'implantation ci-dessus.
according to the plan of setting-up above.
The SKIMO SPLIT unit is heavy (approximately 30 kg). Take necessary precautions to avoid hurting yourself or
damaging the unit. Never install the unit on your own.
SNDC – 274 chemin des Agriès 31860 Labarthe-sur-Lèze – France
Tél : +33 (0)5 34 480 480 - Mail :

Preparation of the unit

Cabin walls preparation

tion de l'unité SKIMO
SKIMO SPLIT unit

Installation of the unit

– www.sndc.net
sndc@sndc.fr
EN
4
unit
4 trous de fixation
unité sur paroi
fastening
holes
Prépa ra tion pour fix
teur vertica le (dimension : mm)
Preparation for fastening the vertical evaporator unit
(dimension : mm)
Drill in the chosen wall 4 holes in diameter 8 mm
Percer dans la paroi choisie 4 trous en diamètre
8 mm selon le schéma d'implantation ci-dessus.
according to the plan of setting-up above.
Caution
tion de l'unité éva pora -
a
p.21

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Skimo split 24vSkimo split 80v/12vSkimo split 80v/24v

Table des Matières