Suspend and align the radiator (see Fig. 16–20)
When aligning take the position of the con-
necting pipes into account. It must be possible
to screw the two clamp connections without
any difficulty onto the thread of the screw con-
nection and no tensions may arise in the con-
necting pipes.
Put two clamp connections (not included in
the scope of delivery) onto the connecting
pipes.
Suspend the radiator via the screws into
the retainers. Ensure that the radiator does
latch in.
In order to align the radiator sideways:
Slide the retainers.
In order to set the wall clearance: Pull out
or push in the retainers.
In order to set the height: Turn the adjust-
ing screw at the retainer.
Install the lower spacers and fasten the radia-
tor (see Fig. 21–30)
Turn out the lower spacers until these are
positioned flat at the wall and the radiator
hangs straight.
Tighten the upper securing screws.
Mark the lower drill holes for the spacers.
Press the locking clamp to the rear and hang
out the radiator. Put down the radiator so
that the thermostat head and the heating
element (IDV11) are not damaged.
Drill the holes and insert the anchors at the
lower markings.
Dismantle both spacers.
Screw both snap-in bolts tight.
Suspend the radiator via the screws into
the retainers. Ensure that the radiator does
latch in.
Press on both cover caps and slide them to
the rear.
Press the wall support clips onto both spacers.
Connection (see Fig. 31)
Screw the two clamp connections tight.
Completing activities (see Fig. 32)
Cover the radiator completely with the pro-
tective packaging.
Commissioning
Remove the protective packaging com-
pletely before final cleaning or commis-
sioning.
Fill the radiators and vent them using the
bleeding (E). Risk of scalding!
Check the radiator and connections for leaks.
Electrical connection (with auxiliary electrical
operation)
Have the following activities carried out by
an electrician (in accordance with the sepa-
rate instructions):
Installation and connection of the elec-
trical unit
Connection of the heating element to
the electrical unit