Filling And Venting - Wilo Yonos ECO BMS Notice De Montage Et De Mise En Service

Masquer les pouces Voir aussi pour Yonos ECO BMS:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 45
English
• SSM:
An integrated collective fault signal is applied as a potential-free normally closed contact.
Contact load:
• Permitted minimum: 12 V DC, 10 mA
• Permitted maximum: 250 V AC, 1 A
DANGER! Risk of fatal injury!
Improper connection of the collective fault signal (SSM) contact poses a risk of fatal
injury due to electric shock.
When connecting the SSM to the mains potential, the phase to be connected and phase
L1 on the mains connection cable of the pump must be identical.
• Switching frequency:
• Interval between the switching times: at least 5 s
• Switch on/switch off procedures via mains voltage ≤ 300 000 switching cycles during the
service life (80 000 operating hours).
• Switch on/switch off procedures over 0–10V ≤ 500,000 switching cycles during the ser -
vice life (80,000 operating hours)
8 Commissioning
Do not fail to observe the danger information and warnings in Chapters 7, 8.4 and 9!
Prior to commissioning the pump, check that it was installed and connected correctly.
8.1

Filling and venting

NOTE: Incomplete venting will result in noises in the pump and unit.
Prime and vent the unit correctly. The pump rotor room is vented automatically after
a short operating period. Dry running for short periods will not harm the pump.
WARNING! Risk of injury and damage to property!
It is not permitted to remove the motor head or the flange connection / threaded pipe
union for the purpose of venting the system!
• There is a risk of scalding!
Escaping fluid can lead to injuries to persons and damage to the product.
• Touching the pump can cause burns!
Depending on the pump or system operating conditions (fluid temperature), the entire
pump can become very hot.
32
WILO SE 05/2021

Publicité

Table des Matières
loading

Table des Matières