Fuel Pump, Settings; Firing; Safety Device Checks - elco VL 04.540 DP Notice D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Start-up
Description and settings of the fuel oil pump

Firing

Setting and checking the safety devices
Key
1
Suction
2
Return
and access to the bypass screw
(4mm hex. screw) remove for one
pipe operation.
In this case, seal return 2.
3
Nozzle line outlet
3.1
Pressure exit 1
3.2
Pressure exit 2
4
pressure connector
(
for pressure gauge)
5
Pressure release or boost
pressure (for vacuum gauge
or pressure gauge)
st
6
Pressure setting 1
and 2
rd
7
Pressure setting 3
stage
8
Special pressure tap Ps
Does not give the spray pressure.
Do not use it.
32
Principle of functioning
When powered down, the two solenoid
valves integrated into the pump are
closed.
Setting the fuel-oil pressure
On delivery, the pump is set at :
st
nd
- 1
and 2
stage: 10 bars
rd
3
stage: 20 bars
To increase the pressure:
• Turn screw 6 or 7 clockwise.
The maximum negative pressure is
0,4bar in case of direct suction from
tank.
On boost, maximum pressure is 2 bar.
• Check subsequently for leaks.
Firing
Warning:
M16x1.5
The burner can be fired only if all
the conditions enumerated in the
M16x1.5
previous chapters have been met.
• Mount a pressure gauge and a
vacuum gauge on the pump.
• Open the fuel valves.
• Close the thermostatic circuit.
• Disconnect the four-pole plug
M8x1
(controller thermostat).
M8x1
• Unlock the control and safety unit.
• In mode "virgin box", to reach the
G1/8
adjustment mode (see page 9).
The burner develops on the way lighting.
Assess the firing quality.
G1/8
nd
• Change to the "Min setting" point
stage
st
(1
stage) and adjust the combustion
if necessary.
• Check the combustion (CO
blackening index).
• Read and adjust the pump pressure to
reach the required rated capacity:
screw 6.
• Stop for 8s and change to the "medium
setting" point (2
• Check the combustion (CO
blackening index).
• Adjust the air flow on the display.
• Change to the "Max setting" point
rd
(3
stage).
• Read and adjust the pump pressure to
reach the required rated capacity
(screw 7).
• Optimize the firing quality, the
switching to another fire stage and the
combustion results by modifying
dimension Y.
• Make button A rotate toward arrow -:
the CO
index decreases and vice
2
versa. Modifying dimension Y may
involve the adjustment of the air flow
stage.
• Check the combustion :
- CO
index above 12%,
2
- blackening index lower than 1.
Comply with the smoke temperature
value recommended by the boiler
manufacturer to obtain the required
effective output.
07/2009 - Art. Nr. 4200 1023 3700A
• Stop the burner.
• Disconnect the four-pole plug.
• Restart the burner at "Min setting"
• Check the combustion
Do not act upon the pump pressure and
dimension Y settings any longer.
• Adjust the air flow on the display.
• Stop the burner.
• Connect the four-pole plug.
• Restart the burner.
Assess its operation on firing, while
switching to another fire stage or when
increasing or reducing the power.
• Check the safety devices.
Setting and checking the safety
devices
Cell
• Test the cell by simulating
• Replace housings.
• Check:
• Check combustion under actual
and
• Note the results on the appropriate
2
• Put into automatic operation.
• Distribute the information required to
nd
stage).
• Place the boiler-room plate where it
and
2
st
(1
stage).
(CO
and blackening index).
2
disappearance of the flame and a
parasite flame.
- absence of leaks between flange
and front of burner,
- opening of regulator
(limiter and safety) circuit.
operating conditions (doors closed,
housing in place, etc.) and absence of
leaks in the different systems.
documents and communicate them to
the dealer.
operate the boiler.
can easily be seen.