Start-Up; Fuel-Oil Supply; Power Supply; Leak Inspection - elco VL 04.540 DP Notice D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Start-up

Fuel-oil / power supply connections
Pre-start-up checks / Checking for leaks
Altitude correction
Pump in suction (H +) or loading (H -) mode
Altitude (m)
Nominal H (m)
0-500
501-800
801-1300
1301-1800
1801-2200
e.g.: altitude 1100 m. Nominal H = 1 m Actual H 2 m.
Corrected H in suction mode
2 + 1 = 3m
Corrected H in pressure mode 2 - 1 = 1m
Select pipe Ø from table in accordance with length required
between tank and pump.If corrected H in suction mode is
above 4 m, include transfer pump (max. pressure 2 bar)
L (m) of double-tube installation
VL 04.540 DP
corrected
H
Ø (mm)
(m)
10/12
12/14
4,0
51
83
3,0
45
83
2,0
38
82
1,0
32
69
+0,5
29
62
0
26
56
-0,5
22
49
-1,0
19
42
-2,0
13
29
-3,0
6
16
-4,0
0
2
26
Fuel-oil connection
Enclosed diagrams provide required
pipe diameters.
There are two following possibilities:
- Direct suction:
According to length L and suction or
load height H and chance mishaps ;
These lengths include the presence of
a quarter-turn hand-operated valve, a
check valve and four elbows.
Maximum negative pressure 0.4bar.
- Transfer loop:
According to the type of facility,
booster pump characteristics will have
to meet several criteria, notably:
- hourly flow,
- fluid flow speed,
- maximum boosting pressure.
Preference should be given to this
type of installation, in order to obtain
long spray pump life.
0
In both cases, it is compulsory to fit a
120µm filter and quarter-turn hand-
0,5
operated valve on the suction or booster
1,0
(not supplied).
1,5
Important:
2,0
Suction:
• Totally fill suction pipe between spray
pump and tank down-pipe with fuel oil.
Transfer loop:
• Fill, boost, drain and set pressure in
circuit at 2bar max. It is advisable to
install a pressure switch to limit burner
operation to boost pressure.
• Check for possible leaks.
Electrical connection
The electrical characteristics such as
14/16
voltage, frequency, power, are
83
mentioned on the identification plate.
83
Minimum conductor section: 1.5mm²
83
Delayed-action minimum protection
83
83
device: 6.3A.
Refer to the wiring diagrams for the
83
electrical connections (diagram
83
enclosed with the burner and diagram
80
screen printed on socket 7P and 4P.
55
31
Optional:
6
External connection:
- of an alarm between S3 and N.
- of one (or more) hour meter between
B4 and N to totals the operating hours,
and between B5 and N to count the
operating hours at nominal flow stage.
07/2009 - Art. Nr. 4200 1023 3700A
Burner start up simultaneously involves
starting up installation by the fitter or his
representative; only they can guarantee
boiler house compliance with currently
accepted practices and regulations in
force.
The fitter must first be in possession of a
" certificate of gas fuel conformity "
issued either by the approved body or
distributor and also have leak-tested and
drained pipework upstream from the
quarter-turn hand-operated valve. Also,
the fuel-oil suction pipe must be filled
completely, drained and pressurized, if
booster is available.
Pre-start-up checks
• Check:
- nominal voltage and electrical
frequency available and compare
with those indicated on the rating
plate,
- polarity between phase and neutral,
- connection of previously tested
earth wire,
- absence of potential between
neutral and earth,
- direction of rotation of motor,
• Turn off the power supply.
• Check absence of voltage.
• Close the fuel valve.
• Take note of the operating instructions
provided by the boiler and regulator
manufacturers.
• Check:
- that the boiler is filled with
pressurized water,
- that the circulator(s) is/are working,
- that the valve(s) is/are open,
- that the combustion air supply and
exhaust flue are operational and
compatible with the heating
capacity of the burner and the fuel,
- presence, calibration and setting of
electrical protection devices,
- setting of boiler regulator circuit,
- fuel-oil level in tank,
- that the suction line is full,
- position of the flexible piping:
- suction and return,
- boost pressure of 2bar max.,
- position of hydraulic protection
valves and preliminary filter.
Checking for leaks
Fuel-oil
This operation is carried out at the time
of firing when the burner is working.

Publicité

Chapitres

Table des Matières
loading

Table des Matières