Preparing The Pump - Steinbach Comfort 50 Notice Originale

Masquer les pouces Voir aussi pour Comfort 50:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 72
The timer's memory backup function is activated.

Preparing the pump

At the time of delivery, the pump is only partially assembled.
Only hand-tighten all screw connections. Excessive tightening of the screw
connections damages seals and plastic components. Do not use a tool.
You can use Teflon tape to seal screw connections with minor leakage.
1. Loosen the threaded ring
prefilter cover
counterclockwise.
2. Lift the prefilter cover
threaded ring off the pump housing.
3. Place the large O-ring seal
groove on the pump housing.
4. Insert the prefilter
The prefilter is already inserted into
the pump at the factory.
5. Check the O-ring seal for soiling or damage. Replace the seal if necessary.
6. Place the prefilter cover
7. Place the threaded ring over the prefilter cover.
8. Turn the threaded ring clockwise until it is hand-tight.
9. Insert the small O-ring seal
10. Screw the hose connection clockwise into the prefilter cover until it is hand-tight.
11. Place the medium O-ring seal
12. Screw a hose adapter
With the Comfort 50 filter system, the hose adapter is installed at the pressure hose.
The pump is ready for operation. You can now connect it to the lines.
on the
13
by turning it
11
with the
11
into the
17
into the pump.
24
onto the pump housing.
11
into the prefilter cover.
19
into the recess of the pump outlet
18
clockwise into the pump outlet until hand-tight.
12
7
13
11
19
17
24
12
18
25
.
25
55

Publicité

Table des Matières

Dépannage

loading

Ce manuel est également adapté pour:

Comfort 75

Table des Matières