Supplies Required - Bradley S19-120 Manuel D'installation

Masquer les pouces Voir aussi pour S19-120:
Table des Matières

Publicité

Installation
Installation

Supplies Required:

• Teflon tape and pipe sealant
• Piping to 1" NPT water supply inlet
• Adequate supply pipe supports
• Minimum 4" (102 mm) drain to accommodate 30
gallons (115 liters) per minute discharge for shower
waste
• Sign-mounting hardware
Step 1: Assemble components
1. Assemble the components as shown on page 4
(S19-120) or page 5 (S19-120A).
• Apply pipe sealant to all male-threaded pipe
joints.
• Use the rubber grip pad provided or a strap
wrench around pipes when tightening to
prevent marring. Place the grip pad on the
pipe, then put the wrench over the grip pad and
turn the pipe with the wrench.
• Bottom edge of showerhead should be 7'-0"
(2134 mm) from the floor.
Step 2: Connect water supply
IMPORTANT: Do not rely on Bradley's
Drench Shower to support supply piping.
1. Connect water supply piping to 1" NPT inlet
on unit (piping supplied by installer). Provide
adequate supports (supplied by installer) for
supply pipe using pipe hangers or other means.
2. Mount the safety sign to the wall using sign-
mounting hardware supplied by installer.
Bradley Corporation • 215-148 Rev. W; ECN 08-512
4-1/2"
(114mm)
Ø 3.1"
(78.7mm)
7'-0"
(2134mm)
to Floor
9"
(229mm)
S19-120
25-3/4"
(654mm)
6"
(152mm)
Ø 10-3/4"
(273mm)
7'-0"
(2134mm)
(610mm)
to Floor
9"
(229mm)
S19-120A
9/11/08
S19-120, S19-120A
25-3/4"
(654mm)
3-5/8"
(92mm)
24"
(610mm)
3-5/8"
(92mm)
24"
3

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

S19-120a

Table des Matières