Checking up on the device
After the fan installation switch on the current and switch on the fan. Control the blade rotation
and the solidity: if the fan swings excessively switch off the fan, disable the current and perform
the following controls:
• Unloose the screws
• Control if the distance between the four blade terminals are equal (see figure below)
EN
• Twist again the screws
• Control the distance between the ceiling and the extremity of each one of the four blades. It
must be equal.
• Switch on the fan and verify the correct working
• In case of further incorrect working repeat from point one, or contact an electrician.
Models equipped with fastning hook
Warning: Apply to a qualified electrician for installation in case you are not knowledgeable
about electrical wiring.
• Push the lower and upper canopies onto the down rod.
• Run the supply cord up through the centre hole of the down rod.
• Fix the down rod onto the bracket at the motor head with rivet, cotter pin and set screw
provided.
• Slide down the lower canopy and fix it to the lower end of the down rod using set screw
provided.
• Hang the fan onto the suspension hook. (not supplied)
• Connect the power cable to the outlet box (connection diagram as shown in fig.2)
• Slide up the upper canopy and fix it with set screw.
• Mount the blades onto the fan motor with proper bolts and washers.
1. Steel frame ceiling
2. Hook nut
3. Spring washer
4. Washer
5. Threaded hook (not supplied)
6. Power cable
7. Down rod Fig. 3-2
8. Wooden ceiling beam
9. Wood hook (not supplied) Fig. 3-3
10. Concrete ceiling
11. Steel fram
12. S. hook